History of Packaging Waukesha Engines     (added July 2016)

Waukesha Power Systems – Integration with main plant

  • 2003 – moved design and assembly back to main plant – test & paint remain offsite

  • All mfg under one roof

  • Common tools & processes

  • Genset design & assembly changed from a custom job shop arrangement to standardized products with flexibility for customization

 

1101 W St Paul Ave

12/18/2015

9
< Previous Page Next Page >

 

 

Copyright © 2016 Waukesha Engine Historical Society, Inc. and/or General Electric Co. Reprinted with permission from General Electric Co. Trademarks are the property of General Electric Co. All rights reserved

 

WEHS Articles